New bathroom installation complete in Kilcoole

🔥 Completely stripped the bathroom out and installed new floor, insulated plaster boards, new plastered ceiling etc.
🔥 Completely re plumbed the bathroom and installed a triple concealed shower valve.
Did you notice the bath has no taps?
🔥 Because the shower valve controls the ceiling mounted arm and head, the riser rail and the bath overflow is the filler 
🔥 We completely waterproofed the showering area with a tanking kit.
🔥 We installed a niche in the bath area to hold shampoo bottles etc and complimented it with a LED light. We have a LED light for an under mounted vanity unit that is due in soon, we installed a temporary white unit to see the customer throughout Xmas. Also Bluetooth mirror due in next week for us to fit.
🔥 New spotlights and extractor fan in ceiling after it was plastered and painted by us
🔥 New large capacity insulated hot water cylinder installed for this long showers on cold nights 
🔥 New negative head pump to pump the bath and the shower for that hotel feeling pressure for the shower. 
 
If your looking for a new bathroom installation, 
contact us today for a competitive quotation with outstanding quality.

Related posts